12/16/2023 0 Comments Mory hard diareyEasterly, Light.Ī Coy: Worked on KNUCKLE AVENUE. deep also making a berm on trench for 200 x. Two platoons on PELICAN AVENUE worked on 200 x of trench making it 6 ft. 7.1 clearing and deepening the trench to a depth of 7 ft. Wind: North Easterly, Light.Ĭ Coy: Two Platoons on KNUCKLE AVENUE from U. 5.5 and laid trench mats.ĭeepened, widened and drained 125 x BULLECOURT AVENUE from Point C. Deepening and improving trench for 50 x at junction with TIGER TRENCH and a further 240 x deepened and widened, making sumps and relaying trench boards.ĭ Coy : Deepened, widened and drained BULLECOURT AVENUE for 150 x thus completing trench to the road point C. Wind: Northerly to North Easterly.Ī Coy : worked on KNUCKLE AVENUE deepening and widening (5' x 2' 6") & making sump hole, passing places and steps.ī Coy : worked on PELICAN AVENUE - 47 trench boards carried from DUMP and laid. ĭ Coy: Deepening and laying 40 track mats thus completing TANK AVENUE.ĭeepening and widening LONDON TRENCH from U. (b) Deepening & widening BULLECOURT AVENUE at point C. Carrying and laying 190 trench mats in BULLECOURT AVENUE working from C. deepening and widening and laying trench mats, and also made berms.Ĭ Coy: (a) Deepening & widening 3 traverses in BULLECOURT AVENUE at LONGATTE. Steps, 18 sumps & Passing place constructed.ī Coy: worked on KNUCKLE AVENUE from STRANGEWAYS, S.W. 0.8 with the exception of 33 x from STANGEWAYS which did not require it. Deepened to 5' 6", widened to 5' at top 2' 6" at base, bermed and laid trench mats from U. 45 sumps made under trench mats made 2 crossing places, 2 steps and bermed. Deepening to 5' 6", widened to 5' at top and 2' 6" at base from U. (This was very difficult as the ground here is one mass of shell holes & loose earth.) from U. Deepening to depth of 5' 6" and where possible widening the trench to 5' at top & 2' 6" at base. Wind North to North Easterly.Ī Coy: worked on KNUCKLE AVENUE from STRANGEWAYS - FRONT LINE. Watercart track improved and wheel guards arranged along the side. Easterly.ĭ Coy: improving cross country track, new plank bridge constructed over drain on to the road. Wind: rather strong N.W.īattalion inspected by Campanies. The Battalion moved at 9am to 61a Camp at LOGEAST WOOD. This diary sheet apparently scanned out of order - location and month assumed as previous. 3.5 by taking trench mats, deepening and draining trench, afterwards placing trench mats in position.ĭ Coy: Deepening and widening LONDON TRENCH U. afterwards worked on that part of the trench from EMBANKMENT to U. 50 x of TIGER TRENCH.Ĭ Coy: BULLECOURT AVENUE to point 31 from EMBANKMENT deepened, widened and drained and trench mats laid. The whole of the trench as far as the junction with TIGER TRENCH with trench boards.Ģ00 x was channeled in addition. Wind North Easterly kight.ī Coy: Continuation of work on PELICAN AVENUE. from the EMABNKMENT ready for fixing.Ĭutting out 60 x of channel and fixing 30 trench mats above same. Loading 240 trench mats on trucks at ECOUST and carting same to point U. distance 450 x also laid trench mats on same.Ĭ Coy: Unloading 200 trench mats from train at ECOUST. Wind North Easterly.Ī Coy: widened and deepened KNUCKLE AVENUE from point U. Deepening and widening trench continuation of BULLECOURT AVENUE for 450 yards.Ĭompleted ready for trench boards from C. Other parts of the trench were deepened, widened and cleared.ĭ Coy: BULLECOURT AVENUE: 40 yards of mats relaid. Deepening and widening Trench from a point 100 x along KNUCKLE AVENUE for a distance of 220 x, also a berm of 2' put on this stretch and 105 trench boards laid.ī Coy: PELICAN AVENUE: Berm was cleared for 1' 6" from the top end of PELICAN AVENUE to within 200 x of TIGER TRENCH.Ĥ5 trench boards laid, channels being dug in the floor of the trench. Wind North Easterly strong.Ī Coy: KNUCKLE AVENUE U.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |